Beginning of March at thetrevproject

This post was written on the 2nd of March so it is slightly out of date as I am posting it on 12th – nearly time for the next update already! I will however start with a before and after photo of the entrance to our house. This is the first of the promised before and after shots. The trouble is that we have a myriad of photos and the right one often cannot be located, or, we didn’t take the photo we thought we had taken.

Ha – just wanted to get Fred into a post May 2015 to July 2017 saw a bit of a change.

This the change in our entrance, before (May 2015);

Although technically that is not before because we had already done quite a lot of work clearing up. This is what it looks like now February 2017

Not a lot to report on the building side at the moment. The One great thing that did happen ws that we had some dry weather so the mud dried up (mind you the “Beast from the East” may have reversed that now). Anecdotal evidence suggests this is one of the wettest winters on record in Cornwall. I just hope that means a drier summer this year, but not too dry. Some pictures below of the track by our back gate shows how the weather has dried up.

Whilst on the weather we did get about 10cm of snow but it was dry and powdery so it blew around a lot. We have an old wooden sledge which we couldn’t really use as the runners just cut through the snow to the ground and didn’t slide well. We did get the twins on it for a ride round the garden being towed by Daddy. The biting wind meant that we didn’t stay out long. As it was Louise’s birthday we went back inside for birthday cake quite quickly. Later we walked down the hill to the river for a cup of tea with a neighbour. The walk down was easy but the walk up was harder than usual because of the snow.

The biting cold highlighted an issue with our house. The heating struggles in cold weather so we have had to use fires all day and I haven’t sawed enough logs so we are going to run out unless I brave the cold and sharpen the chainsaw and cut some more. Part of the reason the heating struggles is a total lack of loft insulation in much of the house. We are also still without 3 sets of shutters which would have helped keep the heat in.

Another issue is the lack of loft insulation in much of the house. This is partly down to bats. We were having the loft sprayed for woodworm when the contractor spotted a bat. Well bats are like asbestos – as soon as you see a bat you have to down tools and contact the specialist. Our bat consultant said we could continue to spray with bat friendly spray but only on very cold days when the bat would be hibernating and therefore not present in our roof. We have had cold weather recently but our contractor can only fit us in when he hasn’t got other jobs planned.

Work wise I have almost finished the painting in the bathroom and toilet. I still need to do some grouting and I have give half the walls in bedroom 5 a wash and a coat of white emulsion. Technically this is not quite right as emulsion has very low breathability and the walls are lime/mud but, the walls outside are bare, it is upstairs and the walls already had emulsion on them. This room needs to be made liveable by the end of the month for our “Trevster” event.

I purchased a chain saw saw horse for cutting logs into decent sizes. I have a lot of logs in the shed but they are all about 40 – 50 cm long so not suitable for a woodburner.  I now regret having gone for 12 inch blade rather than a 14 inch blade as the 12 inch blade is only just long enough to fit in the clamp and cut through the logs. The other thing with a 12 inch blade is the teeth on the chain are very small and difficult to sharpen well. They need sharpening every hour or so of cutting.

I have cut down some trees for burning in 2 years time. They are basically a hedge that has been neglected and turned into quite mature trees. They are shading an area of the veg patch which could have a poly tunnel installed on it. The wood is for 2 years time as I am allowing it to dry out naturally. Dry wood burns easier and has a much higher calorific value as you are not using part of your heat to evaporate the water in the wood.

 

The Trev Project Bank Holiday Update

Bank Holiday Update

It is a bit late due to us being away for most of the week but here is the update for Bank Holiday week. A few interesting things happened during the week running up to the Bank Holiday.

Firstly we had a delivery of sand in a 27 tonne tipper. We didn’t think we could get such a big lorry down our road.  Not only did he arrive safely but he came up the hill from Penpol – anyone who knows that road will tell you it is steep, narrow and there are no passing places for 600 yards or so. A lorry this size will fill the whole road. Now we know practically any lorry can get to our house so we can order almost anything we want for delivery.

The sand was required for the screed floor in the cottage which was duly laid on Wednesday and needs to be left to cure for a week or so. It’s difficult to take a decent picture of the new floor but laying the new floor means that next week the walls can be insulated and plastered.  We are hoping for big progress this week including a plumbing first fit. I have had to bring forward the delivery of the shower tray so that we can have it fitted ready for plaster boarding around the shower.

The next interesting occurrence was that we uncovered the septic tank. As we suspected  there is no man hole on the tank which is about 3m x 3m. We were able to remove one of the concrete slabs and reveal inside a 2 chamber system. The solids chamber is almost totally full with sludge and worms. We know it has not been emptied for at least 15 years  so it does work ok. We now have to find a contractor to empty it before it starts backing up in the pipe. Unfortunately whilst revealing the tank we damaged the pitch fibre sewage pipe. Whilst carrying out a repair we also discovered a cracked inlet T so that was also repaired.

We completed the removal of the render from the east  wall of the house. So we have no more “Polperro Ripple” and only one wall is currently rendered. The west wall has an unknown render on it but it will remain for now. The stone work we have revealed is of mixed quality. Some is quite good and attractive and some is not in very good condition and has quite a lot of slate in it. We still have to decide what to do with it leave it natural or re-render with lime plaster.

The render/finish on the walls of a house of this age is very important. You should not have an impervious outer layer as the walls are designed to breathe. This breathing allows moisture to migrate through the wall and escape thus preventing damp issues. Our house has had two walls with  impervious cement render which is most likely a contributory factor in the amount of rot and wood worm we have encountered. Both the wood worm and fungal rot prefer damp conditions (even so called dry rot needs damp). Wood worm requires a humidity greater than 60% and wood moisture content of greater than 12% to thrive. Fungal rot generally requires greater than 20% moisture in the wood to survive. Moisture contents of between 8 – 16% may be found in a ‘normal’ dry domestic dwelling wood.

 

This week also saw the mowing of the main sector of the lawn. Cutting a large area with a small electric flymo is quite time consuming but it looks good. The so called lawn is mostly meadow grass and weeds and I had left it un-mowed because I though the builders van would be parked on there a lot. We managed to arrange access through the farmer’s yard so we have hardly had any traffic on the lawn. The neater lawn is going to be nice when the building work is over and we look out of our new kitchen.

Also in preparation for a life after builders we have purchased and assembled a chicken coop. We plan to have our own fresh eggs and vegetables. Gardening at this house will be a challenge as there is very little topsoil and it is very windy. Many plants show signs of wind burn on new leaves when they are produced.