The Trev Project First week in July

This is the beginning of July update. It’s a bit late but here is the first week of July update any way.

After a quiet week last week some visible progress this week despite the rain.

First of all the heritage roof light went in to the cottage on Monday. What you may ask is a heritage roof light – well basically an expensive one that is supposed to look in keeping with the period of construction. It was specified due to the Grade II listing but why we needed a special one who knows. It is incredibly heavy so we do get something for our money  and it does look very good.  It goes in the kitchen which is in the middle of the cottage and gives a nice lot of light in the middle of the building.

Unfortunately on Tuesday the heavens opened and the roofers disappeared. We couldn’t open up the roof while it was pouring with rain.

We installed the 4th window as well and the internal sills were installed on all of them. We were therefore able to finish the internal insulation and plaster board and we are ready for plastering . Then we are able to get on to finishing  – well we still need glass in the windows and the handles etc.

We have ordered the floor tiles as well for install after the plastering is complete.

In the main house we made the decision to go for new floor boards. There were not enough reclaim boards around  and we need to make progress. We have bent over back wards and further to preserve joists and beams despite the fact it would be cheaper and easier to have replaced the lot. There is still a lot of rotten wood worm riven timber in place. It has all been treated but rot is a fungus and spores are notoriously difficult to kill so you can’t be sure it won’t recur at some point. We just have to try and avoid damp conditions (see and earlier post) and hope we are ok. The picture below is the new floorboards acclimatising – they need to be stored for about a week in the place where they are to be installed to prevent shrinkage or expansion etc.

The structure in bedroom 1 & 2 complete we turned our eyes to bedroom 1. Visually much less rotten but a nice surprise awaited. The wooden lintel above the living room was totally rotten – see picture below. We were already going to install a steel to support the window but now we have to install a second concrete lintel to replace the rotten wooden one. You can see below the very rotten one which should have been as big as the slightly rotten one next to it.

The pictures below are a bit dark but you can see the supports and steel work required to keep the living room ceiling together while the steel reinforcement is installed

 

Another big step forward was the arrival of electricians for the first fix in the main house. This is all the underfloor wiring in phase 1 (the foot of the “L” i.e. bedroom 1,2, & 3 ensuite lounge and new kitchen) off the repair. This is anticipation of new floor boards being laid in the next week.

The collateral from this is that we are very short of space for storing things and our kitchen is taking up a lot of space in the hall way.  This makes it very difficult to check the new kitchen which has arrived but we have identified that a sink is missing so there is a lot of backwards and forwards going on to find out why and where etc.

Another big change is that we have more residents now. Kate and Josh have arrived with the twins so we have even less room for storage. They have only brought one car load of stuff with them and we will collect their belongings in a few weeks.

Also there is a bat house update – the swallows have moved in and the chicks are doing well. I reckon these little beauties are worth about £1000.00 each!!!

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s